我正在尝试使用带有拖动事件的fullcalendar。我想要的是当我将事件拖到事件添加到我的数据库的日历时。我还想要的是当我将现有事件从日历拖到数据库中的另一个日期更新
时使用json获取现有事件没有问题。
也许有人可以通过示例或某些信息进一步帮助我。
这就是我的代码:
$(document).ready(function() {
/* initialize the external events
-----------------------------------------------------------------*/
$('#external-events div.external-event').each(function() {
// create an Event Object (http://arshaw.com/fullcalendar/docs/event_data/Event_Object/)
// it doesn't need to have a start or end
var eventObject = {
title: $.trim($(this).text()) // use the element's text as the event title
};
// store the Event Object in the DOM element so we can get to it later
$(this).data('eventObject', eventObject);
// make the event draggable using jQuery UI
$(this).draggable({
zIndex: 999,
revert: true, // will cause the event to go back to its
revertDuration: 0 // original position after the drag
});
});
/* initialize the calendar
-----------------------------------------------------------------*/
$('#calendar').fullCalendar({
header: {
left: 'prev,next today',
center: 'title',
right: 'month,agendaWeek,agendaDay'
},
editable: true,
events: "json-events.php",
droppable: true, // this allows things to be dropped onto the calendar !!!
drop: function(date, allDay) { // this function is called when something is dropped
// retrieve the dropped element's stored Event Object
var originalEventObject = $(this).data('eventObject');
// we need to copy it, so that multiple events don't have a reference to the same object
var copiedEventObject = $.extend({}, originalEventObject);
// assign it the date that was reported
copiedEventObject.start = date;
copiedEventObject.allDay = allDay;
// render the event on the calendar
// the last `true` argument determines if the event "sticks" (http://arshaw.com/fullcalendar/docs/event_rendering/renderEvent/)
$('#calendar').fullCalendar('renderEvent', copiedEventObject, true);
// is the "remove after drop" checkbox checked?
if ($('#drop-remove').is(':checked')) {
// if so, remove the element from the "Draggable Events" list
$(this).remove();
}
}
});
});
答案 0 :(得分:1)
你能否澄清你的掉线回调中发生了什么?
事件是否在日历中正确显示?
通过调用适当的服务器方法调用javascript中的ajax方法来更新数据库。